BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Routt County Riders - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://routtcountyriders.org
X-WR-CALDESC:Events for Routt County Riders
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=UTC:20220827T080000
DTEND;TZID=UTC:20220827T123000
DTSTAMP:20260404T230742
CREATED:20220731T170945Z
LAST-MODIFIED:20220816T214042Z
UID:4310-1661587200-1661603400@routtcountyriders.org
SUMMARY:Volunteer Trail Work: Soda Mountain Trail\, Buff Pass
DESCRIPTION:Come lend a hand improving the Soda Mtn trail with some dirt work finesse on the climb portion of Soda Mountain on Buffalo Pass! Volunteers will gather at Dry Lake at 8:00 AM to shuttle + ride up to the Soda Mountain Trailhead near Summit Lake. The road is a rough and you will need a high clearance AWD or 4WD vehicle if driving to the trailhead. \nMost work will occur within an out-and-back hike from this trailhead. Please bring a backpack with PLENTY of water for the day\, extra snacks (we will provide some from Honey Stinger and Bar-U-Eat)\, sunscreen & bug spray\, and rain layers! Wear long sleeves + pants that you don’t mind getting filthy\, and closed-toe substantial shoes. \nWe will feed you lunch donated by Yampa Sandwich Company and bring cold drinks for the end of the day. \nWork is listed 8:00AM-230PM but volunteers who need to leave early can do so by transporting themselves up to the top trailhead or arranging for another type of shuttle to the worksite. \nPlease SIGN UP IN ADVANCE and complete the waiver as prompted upon finishing the form fields. 
URL:https://routtcountyriders.org/event/volunteer-trail-work-location-tbd-4/
CATEGORIES:Trail Building,Volunteer Opportunity,Volunteer Projects,Volunteer Trail work
ATTACH;FMTTYPE=image/jpeg:https://routtcountyriders.org/wp-content/uploads/2020/11/Buffalo-Billys-Build-JReiter-Photos-1200px.jpg
END:VEVENT
END:VCALENDAR