BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Routt County Riders - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Routt County Riders
X-ORIGINAL-URL:https://routtcountyriders.org
X-WR-CALDESC:Events for Routt County Riders
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=UTC:20220604T083000
DTEND;TZID=UTC:20220604T123000
DTSTAMP:20260404T232026
CREATED:20220423T144047Z
LAST-MODIFIED:20220503T203034Z
UID:3987-1654331400-1654345800@routtcountyriders.org
SUMMARY:Volunteer Trail Day: Emerald Mountain
DESCRIPTION:We’re celebrating National Trails Day by putting up new signs on our beloved Emerald Mountain. \nWe plan to install some new trail signage\, custom made by our local high school wood shop students\,  as well as clear out & clean up any trails that suffered damage over the winter months. \nThis event will start at 8:30am and run until about 12-12:30 leaving plenty of  time to catch the fun at the Yampa River Fest. Lunch and beverages will be provided. \nLet’s show some love to the things we love most in our community. \nPlease click here to register in advance! Pre-session emails will be sent and include meeting location and other details &   information.
URL:https://routtcountyriders.org/event/national-trails-day-volunteer-trail-work/
LOCATION:Emerald Mountain
CATEGORIES:Volunteer Trail work
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220611T083000
DTEND;TZID=UTC:20220611T123000
DTSTAMP:20260404T232026
CREATED:20220510T165548Z
LAST-MODIFIED:20220510T172551Z
UID:4105-1654936200-1654950600@routtcountyriders.org
SUMMARY:Volunteer Trail Work: Oak Creek Mountain Park
DESCRIPTION:Come lend a hand in the Oak Creek Mountain Park trail system!  We’ll be splitting up into smaller groups to conquer tasks of all magnitudes – installing + upkeep of fenceline\, signage\, trail drainage features + corridor\, and more. \nMeet at the Oak Creek Mountain Park trailhead at 8:30am on Saturday\, June 11th. \nPlease be sure to sign up in advance through this link.   \nCome dressed for the elements\, with a bike to ride before or after! Sturdy boots or work shoes are recommended\, as well as SPF\, work gloves\, and PLENTY of water.
URL:https://routtcountyriders.org/event/volunteer-trail-work-oak-creek-mountain-park/
CATEGORIES:Volunteer Trail work
ATTACH;FMTTYPE=image/jpeg:https://routtcountyriders.org/wp-content/uploads/2020/11/trail-tools-2000px.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220615T173000
DTEND;TZID=UTC:20220615T200000
DTSTAMP:20260404T232026
CREATED:20220503T200254Z
LAST-MODIFIED:20220607T180748Z
UID:4074-1655314200-1655323200@routtcountyriders.org
SUMMARY:Rescheduled: Volunteer Trail Day: Ridge/Rotary Connector
DESCRIPTION:We’re back on the schedule for our Ridge/Rotary connector trail work day!\n\nWe plan to make improvements to this short connector trail: clearing out\, building up\, and tamping down!\n\nThis will be an afterwork event\, starting at 5:30pm at the Ridge/Rotary Trailhead on the backside of Emerald. If you prefer\, you can ride up and meet us at the connector trail on the lower side (Rotary side) at 6pm.\n\nREGISTRATION IS CLOSED FOR THIS EVENT! THANK YOU TO ALL WHO SIGNED UP. 
URL:https://routtcountyriders.org/event/volunteer-trail-day-ridge-rotary-connector/
LOCATION:Rotary/Ridge Trailhead\, Cow Creek Rd\, Cow Creek Rd\, Steamboat Springs\, CO
CATEGORIES:Volunteer Trail work
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220618T080000
DTEND;TZID=UTC:20220618T123000
DTSTAMP:20260404T232026
CREATED:20220503T174634Z
LAST-MODIFIED:20220503T200756Z
UID:4064-1655539200-1655555400@routtcountyriders.org
SUMMARY:Volunteer Trail Day: Buff Pass Trail Clearing
DESCRIPTION:We’re putting some work in on Buffalo Pass getting it ready for a season of shredding! We’ll be working along side the sawyers and clearing out the trails behind them. The day starts at Dry Lake parking lot at 8:00 AM. \nNote that this project will last most of the day on Saturday and you should be prepared for many miles of hiking. This is geared towards volunteers who have been with us for chainsaw clearing projects in the past or have experience with timber work\, not appropriate for young kids. \nVolunteers MUST sign up in advance and complete their waiver  Signups will close prior to the weekend and we will be in touch with more details. \n\nYou will want to bring a backpack with PLENTY of drinking water\, snacks\, work gloves\, earplugs\, eye protection\, sun protection\, sturdy hiking boots\, and long sleeves. \n\nLunch and post work beverages will be provided.
URL:https://routtcountyriders.org/event/volunteer-trail-day-buff-pass/
LOCATION:Buffalo Pass\, Steamboat Springs\, CO
CATEGORIES:Volunteer Trail work
END:VEVENT
END:VCALENDAR